Fluidra and ARKANCE Spain

A Sustainable Transformation for the Santiago 2023 Pan American and Parapan American Games

  • Customers: Fluidra

  • Location: Santiago, Chile

  • Industry: Construction & Infrastructure

  • Solution: ARKANCE Professional Services, AutoCAD, Autodesk Revit, Architecture, MEP Documentation, Autodesk Navisworks Manage, Autodesk DOCS, Autodesk BIM, Collaborate Pro A360 and Autodesk Drive Dynamo

Services provided

Fluidra partnered with ARKANCE Spain to integrate Autodesk BIM tools throughout the project. ARKANCE provided BIM modeling, clash detection using Navisworks, and real-time collaboration via Autodesk Docs and BIM Collaborate Pro.

They also offered specialized training and ongoing support to optimize the use of these tools, ensuring smooth execution and enhanced data visualization.

This collaborative approach enabled Fluidra to tackle the complex renovation and sustainability goals of the Santiago 2023 Pan American Games.

ARKANCE is our technology and consulting services provider, BIM modeling and training in Autodesk solutions. It also provides us with various ARKANCE solutions to increase the productivity of Autodesk software

Xavier Bertran General Manager of Fluidra Engineering

Project Goals

The main goal of the renovation was to bring Santiago's aquatic facilities up to FINA standards for the 2023 Pan American and Parapan American Games, while also creating a sustainable, energy-efficient venue for future use.

Fluidra aimed to meet tight deadlines, deliver top-quality results within budget, and ensure long-term environmental sustainability without compromising on innovation or performance.

Customer Challenge

Fluidra faced multiple challenges in transforming existing aquatic facilities. The renovation needed to meet FINA's rigorous standards while accommodating future adaptability.

Tight project timelines, the need for seamless international coordination, and the challenge of balancing short-term requirements with long-term sustainability goals added complexity. Ensuring smooth communication and collaboration across teams was crucial for success

Solutions

ARKANCE’s expertise in Autodesk solutions played a pivotal role. With Autodesk Navisworks, the teams identified and resolved design clashes early, reducing delays by 80%. Autodesk Revit allowed detailed modeling of both existing and proposed elements, ensuring precise integration.

Additionally, Autodesk’s cloud-based tools like Docs and Collaborate Pro streamlined communication and real-time updates, enhancing team coordination and minimizing errors.

The implementation of a wide portfolio of Autodesk AEC solutions for the transformation of the pools for water sports at the Pan American and Parapan American Games has allowed Fluidra to work in a connected and collaborative way between internal and external teams, data and processes

Iker Otxoa Managing Director for Spain and Portugal at ARKANCE

Business Outcomes

Thanks to the adoption of Autodesk BIM tools and ARKANCE’s support, Fluidra achieved an 80% reduction in delays and a 20% reduction in waste costs. Improved collaboration, efficient design adjustments, and better project management resulted in significant time and cost savings.

The use of digital tools not only ensured the timely delivery of the project but also positioned Fluidra as a leader in sustainable, innovative construction practices.

The result has been an advance in collaborative work and the optimization of cost and time. In addition, it has positioned us as a valuable partner in favor of constant innovation and the search for sustainability for the efficiency of projects.

Iker Otxoa Managing Director for Spain and Portugal at ARKANCE

Project Insights

The renovation of Santiago’s aquatic facilities for the 2023 Pan American Games stands as a testament to Fluidra’s commitment to sustainability and innovation. The successful partnership with ARKANCE and the strategic use of Autodesk BIM tools streamlined the project, improved collaboration, and ensured the venue met both immediate and future needs.

This project has set a new benchmark for future sustainable renovations in the industry.

Download Case Study

Download the full PDF Customer Case Study to discover the full solution stack and detail on the project

Fields marked with an asterisk (*) are mandatory.