Vítejte v našem novém domově!

Z Arkance Systems je teď ARKANCE. Nyní budete automaticky přesměrováni na náš nový web arkance.world

Děkujeme, že jste si vybrali ARKANCE

How BIM 360 Revolutionized Kalpataru's workflow

Client: Kalpataru Limited

Location: India

VinZero Partner: Capricot

Industry: Manufacturing & Data Management

Autodesk Solutions: Autodesk BIM 360 Docs

OVERVIEW:

Founded in 1969, Kalpataru Limited is one of India's leading real estate companies. A recipient of several global awards in design and quality, Kalpataru has created defining landmarks that have set new standards in real estate development for close to half a century. From building Mumbai's tallest residential tower in the 70's, a record that stood for the next quarter of a century, to introducing the concept of 1.5 bedroom homes, to building Asia's first, and the world's sixth Platinum LEED certified commercial building, to being among the earliest adopters of eco-friendly construction methodologies, today, Kalpataru's projects are ever growing vibrant life spaces for thousands of satisfied families.

CHALLENGES:

  • Managing huge data in local drives and share point

  • Documentation and maintenance of design files

  • Lack of Connected/latest information or data which is shared across numerous departments in any project

  • Duplication of data

  • Cost constraint on managing their local drive and email spaces

  • Lack of connected/standardized workflow in project


SOLUTIONS:

To streamline their document management process, Capricot implemented the use of Autodesk BIM 360 Docs, which acts a common data repository for multiple file types. In order to effectively switch to this new solution, two phases of user level tool based BIM360 application training were conducted and scheduled for the selected ongoing projects with the user count of more than 180 including external consultants. The first phase was all about the basics of BIM 360, Account Activation and live tests on dummy projects. The second phase focused on actual project on-boarding. Once training was complete, Capricot then worked with Kalpataru to set up the necessary folder structures and workflows as well as migrate both legacy and live project data across to the new system. Periodic follow-up activities were also conducted to ensure the system was working as required.

BUSINESS OUTCOMES:

Adopting BIM 360 Docs has afforded Kalaptaru the following benefits;

  • Paperless approach that leads to added cost and time savings

  • Higher quality project at the end of the day

  • Direct cost saving and reduced cost percentage on administration of having printed documents

  • Elimination of potential delay of projects due to immediate share of data

  • Real time accessibility of drawings which lead to increased collaboration